Model: |
CY-03CM |
Air flow: |
6000 m3/h |
Voltage: |
220V-240V, 50HZ/60HZ |
Power: |
280W |
Decibel: |
≤60Db |
Fan type: |
Axial |
Water tank: |
30L |
Controller: |
remote controller 3 speed
manual controller 3 speed |
Swing: |
auto left and right, manual up and down. |
Size: |
1080*550*910mm |
Weight: |
35KG |
Usable area: |
50-60m2 |
Air filter
Plug off, unscrew the filter and press the buckle, the air filter can be taken out. Wash the air filter with soap water and soft feather brush, dry it and soft feather brush, dry it and reassembly it.
Wet curtain
Plug off; Take wet curtain out of the unit behind air filter. And wash it with clean water, at last refit it,
Note: The water pressure should be proper while cleaning. It is forbidden to wash wet curtain with acidic and alkaline detergent.Evaporative air cooler
Water tank
Plug off, open the cover of cleanout port, drain the dirty water and add clean water.
Proposal: It is better to replace clean water per day; The water place too long may smell odorous.Evaporative air cooler.
FAQ:
Q1: Are you the trading company or manufacturer?
A1: Our company is evaporative air cooler global suppler that specializing manufacture in the air cooler (industry or home), exhaust fan and air cooler parts. We have profuse designs with series quality grade and expressly.
Q2: Can you offer me better price?
A2: Our price is very competitive because we are the designing, molding, injection, sales of one of manufacturers.
Q3: Can you make specific voltage and thickness of cooling pad, and use our own brand ?
A3: We can offer 110V-120V, 220V-240V, 380V-415V., frequency 50HZ-60HZ. Cooling pad always we use is 10mm, if you need 12mm, we also can make for you. For air cooler brand, we can OEM & ODM for you.
Q4: What is the payment term?
A4: Always is T/T(30/70), also the at sight L/C.
Q5: How long is your air cooler warranty?
A5: The warranty time for air cooler is 1 year. If the parts broken in 1 year, we all can offer you new parts in next order.
Q6: How long is the delivery time?
A6: Generally it is within 7-10 days after the deposit. but also depend on the order quantity. we promise offer in 1 month.